Metro business data is integrated to intuitively present comprehensive situation of metro operation, sense operation risks, and provide data basis for decision-making.
Integrate data analysis model analyzes various data such as passenger flow, traffic, electric power, calculates resource dispatching configuration, and support decision-making.
The safe and reliable linkage command of line network operation is realized by sensing operation safety situation and coordinating dispatching resources, so as to ensure safety operation management requirements.
The real-time management of equipment operation status is conducted by station video monitoring and equipment energy consumption monitoring, so as to timely give early warning and prompt for equipment breakdown.
Based on BIM lightweight bearing, 3D simulation scene of station is constructed to integrate the data of various business systems to realize intelligent operation management of station, such as one-key switch station, equipment maintenance management, energy consumption management, passenger flow control, etc., and to improve intelligent operation and management level of station through various visual means.
The system can import and load lightweight BIM 3D design models such as single station, multi-station, tunnel Revit and Bentley, to realize the integrated query of ground station, underground pipeline, tunnel and geological information, and to construct a basic 3D visualization scene of metro digital twin foundation.
Based on the functions of large passenger flow alarm, evolution analysis of traffic flow and passenger flow, inquiry of emergency plan and emergency resources, the decision-making basis for quick emergency disposal is provided, and emergency resources such as materials, institutions and personnel are presented in one map by mean of multi-mode search, to intelligently help decision makers with an emergency process
All kinds of business systems of stations, lines and network are integrated, to establish visual topics such as passenger flow, traffic, equipment and energy consumption, and to construct centralized dispatching center so as to enable decision makers to quickly grasp information points, comprehensively master key data, and improve management level and operation efficiency during metro operation process.
Spatial data and urban data are integrated, to make metro business shift from traditional 2D business monitoring system into unified 3D scene, finally to comprehensively dispatch and monitor the whole line, station, passenger flow, energy consumption and so on.